A bottom belling bucket enables expanded pile construction with a capacity of 5 times even at a narrow site.
Our company can drill down to the bottom with a hydraulic expansion bucket to form enlarge bottom pile.
Placing of striking steel pipe and concrete piling method that demonstrates excellent earthquake resistance.
The construction method that can buid an enlarged bottom pile without removing the existing building foundations, pile and then using the earth drilling machine.
The construction method that can build up an enlarged bottom pile even in the support formation layer of soft rock and medium hard rock.
Eco-friendly, earthquake resistance construction method that includes large vertical support force and withdrawal strength.
The method of drilling and discharging earth by a drilling bucket attached to the kelly bar of the earth drill machine.
A method of protecting the whole length of the borehole by steel casing tube.It is adopted for underground obstacle removal work.
A method of drilling the ground by rotating the bit, sucking up earth and sand together with the water inside the hole from the tip of the bit.
In addition to general PHC pile,construction type of which pre-boring method and Nakahori construction method using PRC pile and SC pile.
Construction method that can be constructed on narrow ground where excavators are light and compact so they can be carried on narrow roads.
A method of performing excavation by human power or a machine while holding over with steel corrugated board and ring frame.
The method to put RC ring on the pile head and join the pile and foundation. It is the method to reduce stress at the time of earthquake.